Fabtech pharmaceutical projects in Saudi Arabia
Fabtech has three published projects in Saudi Arabia. For the oncology plant of Sudair Pharma, we delivered the cleanrooms, the HVAC and the clean utilities as one turnkey project.
We reply within 24 hours.


An oncology plant makes cancer medicines. HVAC is the heating, ventilation and air conditioning system.
At Madinat Al-Dawaa, we supplied the cleanrooms and the water and steam systems of the plant. The purified water system there makes 1,000 litres per hour.
In a turnkey project, one company designs, supplies, installs and tests the plant under one contract. At Sudair Pharma, our contract was for the three parts named above.
The process machines came from other suppliers.
On this page
Fabtech projects in Saudi Arabia
Fabtech has three published projects in the Kingdom of Saudi Arabia (KSA).
The first is the cleanrooms, the HVAC and the clean utilities of Sudair Pharma's oncology plant, delivered as one turnkey project. The second is the cleanrooms and the utilities at Madinat Al-Dawaa.
The third is a project for Sanofi.
Key fact Detail
- Sudair production facility
- 6,285 square metres
- Purified water generation
- 1,000 litres per hour, at Madinat Al-Dawaa
- WFI generation
- 500 litres per hour, at Madinat Al-Dawaa
- Oncology facility
- Sudair Pharma: cleanrooms, HVAC and clean utilities, delivered by Fabtech as one turnkey project
- Published projects in Saudi Arabia
- Three
Sudair Pharma

Sudair Pharma's plant is an oncology manufacturing facility. Before Sudair chose Fabtech, it sent a team to our factories.
The team inspected them, assessed our technical teams and checked our references. Sudair then gave Fabtech one turnkey project.
It was for the cleanrooms, the HVAC and the clean utilities of its production plant of 6,285 square metres. The process machines came from other suppliers.
Work done: cleanroom and HVAC and clean utilities. A cleanroom is a room where the air is filtered and controlled.
Clean utilities are the purified water, steam and gases that a plant uses.
Read the Sudair Pharma turnkey project case study, or see Sudair Pharma, Saudi Arabia in our projects.
Madinat Al-Dawaa

At Madinat Al-Dawaa, Fabtech supplied the cleanrooms and the utilities of the plant. Later, we also supplied spare parts for the water system and upgrades for the BMS, the building management system.
Work done: cleanroom modular panels, epoxy flooring, the HVAC system, cleanroom equipment, the electrical system and fire fighting. Epoxy flooring is a hard, smooth floor coating that is easy to clean.
The water work was a purified water generation system, a WFI generation system and pure steam generation and distribution.
Project page: Madinat Al-Dawaa, KSA.
Sanofi

Fabtech has a project for Sanofi in Saudi Arabia. Project page: Sanofi, Saudi Arabia.
The water and steam utilities at Madinat Al-Dawaa
Utilities are the services a plant needs to run: water, steam, air and gases.
Fabtech supplied several water and steam systems at Madinat Al-Dawaa. The steps below follow the order in which water usually moves through a plant.
Our high purity water systems page shows the full range.
Raw water
The water enters the plant as raw water, before any treatment. Fabtech supplied the raw water distribution system.
A distribution system is the pipework that carries water to each place where it is used. We also supplied the pipework for drinking water (potable water).
Purified water generation
Next on the route is the system that makes purified water. Purified water is water with salts, particles and germs removed to the standard that medicines need.
At Madinat Al-Dawaa, this system makes 1,000 litres per hour.
Purified water distribution
Purified water leaves its storage tank through a loop of pipe. In most plants, the loop carries the water to each point of use and back to the tank.
The water keeps moving. Fabtech supplied the pipework for purified water at Madinat Al-Dawaa.
WFI generation
The next system makes WFI (water for injection), the highest grade of water in a medicine plant. WFI must also be free of endotoxins, which are substances from bacteria that cause fever.
In most plants it is made from purified water. At Madinat Al-Dawaa, this system makes 500 litres per hour.
Pure steam
Steam comes after the water systems. Pure steam is clean steam that a plant uses to sterilise machines and pipes, which means to kill all the germs on them.
Fabtech supplied a pure steam generator rated at 300 kg. We also supplied the pipework that carries the steam.
Compressed air, nitrogen and boiler steam
The other utilities come next. We supplied the air compressor and its pipework.
We also supplied the nitrogen piping, and the boiler with its steam pipework. A hot water system of 3 cubic metres per hour was part of our supply too.
Controls: BMS and SCADA
The last step is the controls. A BMS watches and controls the building services, such as the HVAC.
SCADA is software that shows the plant staff what each machine is doing and keeps a record. Fabtech supplied the BMS and a SCADA system for three control panels.
How a Fabtech project in Saudi Arabia runs
We start with design.
Our pharmaceutical engineering services cover the layout of the plant, the cleanrooms and the utilities.
Then we supply the equipment, install it and commission it.
Commissioning means starting each system and checking that it runs.
At Sudair Pharma, we also installed machines that other suppliers had delivered.
Then we qualify the plant. Qualification means the written tests and records that prove the plant works as designed.
Its four stages are DQ/IQ/OQ/PQ: design, installation, operational and performance qualification. Our equipment qualification page explains each one.
Our case study records that the Sudair Pharma plant was completed and is in operation. Work done this way, under one contract, is a turnkey pharmaceutical project.
Fabtech builds plants that are GMP and WHO compliant. GMP is good manufacturing practice, the rules a medicine plant must follow.
Fabtech in Saudi Arabia: how to reach us
The corporate office of Fabtech Technologies Ltd is in Mumbai, India.
We work for international clients. Buyers in the Kingdom of Saudi Arabia (KSA) can contact our team in Mumbai.
Send us the product you plan to make, the site and your timeline. We reply within 24 hours.
What Sudair Pharma said about Fabtech
Despite the harsh weather conditions, different living culture, logistics and visa challenges, Fabtech stuck with the agreed plans and timelines.

FAQ
Does Fabtech deliver pharmaceutical turnkey projects in Saudi Arabia?
Yes. For the oncology plant of Sudair Pharma, we delivered the cleanrooms, the HVAC and the clean utilities as one turnkey project. The process machines came from other suppliers.
Which Fabtech projects in Saudi Arabia are published?
Three projects are published: Sudair Pharma, Madinat Al-Dawaa and Sanofi. Each one has its own page on our website.
What can Fabtech supply for a pharmaceutical plant in Saudi Arabia?
At Madinat Al-Dawaa we supplied the cleanrooms, the HVAC system and the purified water, WFI and pure steam systems. Fabtech also supplies process equipment. We can deliver them together as one turnkey project.
How does Fabtech install equipment in Saudi Arabia?
Our team installs the equipment, starts each system and checks that it runs. At Sudair Pharma, we also installed machines that other suppliers had delivered.
Who qualifies the plant?
Fabtech does. Our team carries out the four qualification stages, DQ/IQ/OQ/PQ, and gives you the records.
How do I start a project with Fabtech in Saudi Arabia?
Send us the product you plan to make, the site and your timeline. We reply within 24 hours.
Tell us about your project in Saudi Arabia: the product, the site and the timeline