Purified Water Generation & Distribution

Fabtech designs and supplies purified water systems with hot water sanitisation (HSRO) or chemical sanitisation (CSRO). Purified water is the water grade a pharmaceutical plant uses most.

Tablets, capsules, syrups, creams and every wash cycle need this water. The system has to work every day for fifteen years. It also has to prove, in writing, that the water met its limits on every one of those days.

We reply within 24 hours.

Fabtech supplies each purified water generation and distribution system on a skid. A skid is a frame that carries all the treatment equipment as one unit.

We design each system from your raw-water analysis. The system ends in a closed loop of pipe.

The loop carries water at the right quality to every user point, the places in the plant where water is drawn. We also supply the documents to qualify the system.

Key fact Detail

Reverse osmosis sanitised by hot water (HSRO) or by chemicals (CSRO)
HSRO or CSRO
Regulators whose expectations the systems meet
USFDA, WHO and MHRA
Field piping, with zero dead leg valves
ASME BPE grade
Skid formats, for best performance or smallest footprint
Standard or reduced skids
Qualification documents supplied
DQ, FAT, IQ and OQ

The purified water generation system Fabtech supplies

Fabtech supplies the whole system, on a standard skid or on a reduced skid for a smaller footprint.

A purified water generation system is a series of treatment steps that turns source water into purified water. It also includes the tank that stores the water and the loop that moves it through the plant.

Buyers also call it a pure water generation system, a high purity water generation system or a purified water preparation system. All these names mean the same skid.

It has pre-treatment, membranes, ion exchange and ultraviolet (UV) light. After these steps, a loop keeps the water moving until it is drawn.

Purified water and water for injection (WFI) differ in one main way. WFI is distilled after purification.

This step removes endotoxins, which are toxins left by bacteria. WFI is also stored hot.

If your product is injected, you need WFI. Everything else uses purified water.

Our beginner's guide to purified water generation systems explains each stage in plain words, from raw-water analysis to distillation.

What Fabtech's purified water system delivers

The skid takes in whatever water your site has.

It gives the plant purified water it can use, at every tap, all day. Fabtech designs and engineers its Purified Water (PW) Systems to take in any source water and deliver USP grade purified water efficiently.

The systems have a sanitary design, high recovery and stable conductivity. High recovery means that little of the water goes to drain.

Conductivity shows how much salt is left in the water. A complete closed-loop piping system carries the water to every user point in the plant.

The systems meet USFDA (United States), WHO and MHRA (United Kingdom) expectations. They follow ASME BPE, ISPE and cGMP guidance.

We set up the treatment train to suit your water. The treatment train is the set of steps the water passes through, in order.

We do not sell it as a fixed package. The table shows what it contains.

RO means reverse osmosis, UF means ultrafiltration and EDI means electrodeionisation.

What you getDetail
Treatment trainPrefiltration + RO + UF + EDI + distribution, with UV before the loop; ultrafiltration sits in pre-treatment or as polishing depending on the raw water
Sanitisation optionsChemically sanitisable reverse osmosis (CSRO) or hot water sanitisable reverse osmosis (HSRO)
Skid formatsStandard skids for optimum performance, or reduced skids for minimum footprint
AutomationAutomatic or semi-automatic variants with validated interlocks; 21 CFR Part 11 compliant control where electronic records are used
Materials and fabricationElectropolished vessels and distribution piping internals; orbital welding with boroscopy and videoscopy records
Field pipingASME BPE grade piping with insulation, fully drainable, integrated with zero dead leg valves, instruments and pendants
Biofilm controlReturn-loop velocity designed in by default, to keep the loop scoured and reduce the risk of biofilm (a layer of bacteria on the pipe wall) forming
DocumentationDesign qualification, FAT protocols, IQ and OQ protocols and reports to support your validation

How we design the system for your plant

Purified water generation system design starts from your plant.

We do not pick a skid from a catalogue. Two plants with the same capacity can need very different skids.

The raw water coming in decides the first treatment steps. The product and the pharmacopoeia decide the last steps.

A pharmacopoeia is the official book of quality limits, such as the USP (United States), EP (Europe) or IP (India).

The number of user points and the cleaning schedule decide the loop. We decide each of these before the skid is built.

Design inputWhat we ask forWhat it sets
Raw-water analysisHardness, silica, TDS, free chlorine, silt density index, iron, microbial countSoftening, dechlorination, antiscalant dosing, whether ultrafiltration is needed ahead of RO
Target qualityUSP, EP or IP purified water; any tighter internal limit for conductivity or TOCRO pass count, EDI sizing, UV placement, instrumentation
Demand profilePeak litres per hour, daily volume, cleaning and CIP schedules, future linesGeneration rate, storage tank volume, loop flow and pump duty
Sanitisation strategySite preference and existing proceduresHSRO or CSRO, hot-water or ozone loop sanitisation, heat exchanger sizing
Site and utilitiesPlant room space, drain, power supply, compressed airStandard or reduced skid, automation level, 50 or 60 Hz equipment

The guide linked above explains each stage of the purified water generation process itself. If the raw-water data and the demand figures are right, the rest of the design follows from them.

Choosing between HSRO and CSRO

In a purified water tender, the most common question is which reverse osmosis sanitisation to choose.

Sanitisation is the regular step that kills microbes inside the system. HSRO and CSRO both produce the same water.

They differ in how the membranes are kept clean, and in what that costs the plant over time.

ConsiderationHot water sanitisable RO (HSRO)Chemically sanitisable RO (CSRO)
How it is sanitisedHot water cycle through the membranes, no chemicalsValidated chemical sanitisation cycle
Chemical handling on siteNone for sanitisationSanitising agents stored, dosed and rinsed out
Membranes and hardwareHot-water-rated membranes and heat exchanger, higher first costStandard membranes, lower first cost
Typical fitMulti-product sites, tight microbial limits, sites that want a chemical-free routineSmaller plants and sites with established chemical procedures
ValidationTime and temperature are simple to proveRinse-out and residual checks add steps

A hot water set heats the water used to sanitise the system. Getting hot water sets that comply with ASME BPE standards would typically be part of the HSRO option.

This includes the heat exchanger and the hot loop. We confirm the scope of the hot water set before we quote.

We recommend one route after we see your raw water and your operating procedures. We write the reasons in the design qualification (DQ), the document that records the design.

An auditor can then follow them.

The distribution loop

Making purified water is only part of the job.

The water must also stay pure between the tank and the tap. Inspection findings on a water system often start in this part.

A purified water generation and distribution system can only be as good as its loop.

We design the loop as a ring main. A ring main is a ring of pipe in which the water circulates all the time.

It runs from the storage tank, past every user point and back to the tank. It has no dead legs.

A dead leg is a short closed branch where water can stand still.

The water returns at a speed, the return velocity, that keeps the pipe wall scoured clean. General practice is a return velocity of at least 1 metre per second, with fully turbulent flow.

Fabtech sets its own design value for each loop.

Built to ASME BPE

Fabtech supplies the tank, the distribution pumps, the UV and the loop piping to ASME BPE. ASME BPE is the standard for hygienic equipment and piping in pharmaceutical and biotech plants.

The pipe runs are sloped and fully drainable. Each point of use has a sanitary diaphragm valve.

The loop is typically sanitised with hot water. Ozone is an option.

The choice is made at the design stage.

Line support

Purified water distribution line support is part of the installation scope. This covers the pipe supports, the insulation and the pipe route through the plant.

The factory acceptance test (FAT) proves the slope and drainability. This work keeps them the same on site.

Installation, qualification and handover

A purified water skid arrives on site already tested.

The field piping still has to be welded and the loop connected. Then the whole system has to be proven in place.

Fabtech installs the skid, welds and documents the loop, and then runs the qualification with your team. Qualification is the written proof that the system is installed correctly and works as designed.

Few vendors offer the full turnkey scope for high purity water systems in India, from skid to installation to the final sign-off. Turnkey means one contract covers the whole job.

At Fabtech this full scope is normal. We do not charge it as an extra.

We plan performance qualification across the seasons. Raw water changes through the year.

The system has to meet its limits in the wet season and in the dry season. Sometimes the water system is part of a larger build.

Then we deliver it inside the turnkey pharmaceutical project. Its utilities and its documents then match the rest of the plant.

StageDeliverable
DesignUser requirement review, piping and instrumentation diagram (P&ID), loop layout, design qualification
FactorySkid build, factory acceptance test protocol and report
SiteInstallation, weld logs and boroscopy records, passivation and slope verification
QualificationIQ, OQ and PQ: installation and operational qualification protocols and reports, performance qualification plan
HandoverOperating procedures, training, the complete dossier

Our guide to validating high purity water systems explains what inspectors look for once the system is running.

Why buy the system from the manufacturer

Purified water generation systems manufacturers range from skid assemblers to full-scope engineering companies.

Buyers who search for a purified water generation system manufacturer are looking for one company that takes responsibility for the system.

Sometimes one company supplies the skid, a second installs it and a third qualifies it. Then, when the water quality starts to change, three companies blame each other.

Fabtech designs the train, supplies the skid, installs the loop and qualifies the system as one scope of work. So Fabtech is also the company you call in year five.

The same engineering team supplies the WFI generation systems that take purified water as their feed. It also supplies the pure steam generators that use purified water.

A plant that needs all three gets one design, one set of interfaces and one dossier. The full range is on our solutions for water page.

Fabtech delivers purified water systems as part of turnkey projects for pharmaceutical plants in international markets.

FAQ

What is the difference between a purified water system and a WFI system?

Both start with the same pre-treatment and reverse osmosis train. A WFI system adds a distillation stage to remove endotoxins. It also stores the water hot in a circulating loop. Purified water is used for non-sterile products and for cleaning. WFI is used wherever the product is injected.

How is a purified water generation system designed for a pharmaceutical plant?

The design starts from the raw-water analysis. The analysis sets the pre-treatment. The pharmacopoeia and your internal limits set the RO and EDI stages. Peak demand and the number of user points set the tank, the pumps and the loop. We record the design in a design qualification before the skid is built.

Do you supply the distribution loop as well as the generation skid?

Yes. We design and supply the storage tank, distribution pumps, UV, loop piping and point-of-use valves together with the skid. We design and supply the loop sanitisation system with them. This way our engineers design the return velocity and drainability. They are not left to the site contractor.

Which is better, HSRO or CSRO?

Fabtech designs and supplies purified water systems with hot water sanitisation (HSRO) or chemical sanitisation (CSRO). Neither is better in every case. HSRO needs no sanitising chemicals. It is simpler to validate, but it costs more to buy. CSRO costs less and suits sites with established chemical procedures. We recommend one after we review your raw water and operating practices.

Do your hot water sets comply with ASME BPE?

The hot water sanitisation set includes the heat exchanger and the hot loop. It would typically be built to ASME BPE, with electropolished internals and documented welds. We confirm the scope of the hot water set before we quote. The same standard applies to the generation skid and the distribution piping.

What capacity range do you supply?

We size each purified water system to the plant. Sizes go from small pilot and laboratory systems to plant-scale generation. This is within the 500 to 50,000 litres per hour range of our water systems. We size storage and loop capacity separately, to the demand profile.

What documentation comes with the system?

The system comes with a design qualification. It also comes with the factory acceptance test protocols and reports, and the installation and operational qualification protocols and reports. You also get the weld and boroscopy records, and the material certificates for the wetted parts. Wetted parts are the parts that touch the water. We plan performance qualification with your quality team.

Can an existing purified water system be upgraded rather than replaced?

Often, yes. Several changes can be made on an existing generation train. EDI or UV polishing can be added. A loop that has dead legs can be replaced. Chemical sanitisation can be changed to hot-water sanitisation. We start with a survey of the system and its sampling trend.

Send us your raw-water report and your daily demand, and we will design the skid

There is no obligation. The team that would design the system sends you a proposed treatment train, a sanitisation recommendation and a budget estimate.

We reply within 24 hours.